Rental of The Boiler System for 20 months starting 1st May 2016 until 31st December 2017

The Boiler System:

  • 6 x 20 tonne/hour Steam Boiler attached with Economizer
  • 97% Saturated Steam 2 x 60 tonne/hour Deaerator
  • 2 Train of Softener (BPC is looking at Demin Water System to be quoted ASAP)
  • Raw Water Tank & Return Condensate Water Tank adequate to support the boiler feedwater needs
  • Boiler House to house the boilers
  • Control room
  • Compact substation
  • Plinth to place the raw water and condensate, water tank, deaerator, softener, and chimney

All interconnected within the boiler house bringing forth a system well-prepared to produce steam, receiving raw water and the condensate as well as supplying steam to header